Tuesday, November 30, 2010

Roofing


Today the roofers came and put on the underlayment for the roofing - the ice shield and tar paper. The shingles have to be ordered due to the short supply in the area. Hopefully next week we will have a complete roof.....

Tuesday, November 23, 2010

Bathtub Drain



Mick, the plumber, is preparing the second bathroom for the bathtub drain.

Front Door


Here's the front door, waiting to be stained.

Garage Door



Welcome to the garage.

Sliding door


Windows



The Pella truck with our windows arrived today, however, the three south windows were not on the truck. The kit to put together these extra large windows was not ordered...and is still back at the factory in Kentucky...It is what it is.

East Roof Panels




Putting in the east roof panels was a challenge.

Roof




We finally have a complete roof. The guys put in the missing pieces today.

Monday, November 22, 2010

Master Bathroom Vent



More Pipes


This is where the washer & dryer will go.

Plumbing




These pipes lead to the vent for the second bathroom.

Hole in the Wall


After drilling the two inch hole in the wall, Dan is digging out the foam. This is to allow access to the conduit in the wall..

Tub/shower Unit


This tub/shower unit will be in the second bathroom. The trailer sure made transporting this unit easy.

Friday, November 19, 2010

The Last of the Panels


Finally, the missing panels were delivered today.

The Last Frame Up


Dan is leaning on the wall that was framed last. This will become part of the island in the kitchen.

Birthday


The crew, Caesar, Alex, and Roberto, finished framing on Thursday. We celebrated Caesar's birthday before they left. Hopefully, they will return next week to put in the missing panels and the windows.

Hole in the Roof




A pellet stove is on order and will be in the great room. The hole in the roof and the pipe and black box needed to be installed before the framing inspection.

Wednesday, November 17, 2010

Windows



The window openings in the great room are getting a "window lift" due to panels that were made incorrectly.

Eyes

Soffit


Alex is hanging the soffit in the master bedroom.

Arches



Arches, arches everywhere. Actually there are now two in the framing stage. The first one that you see is in the mud room, notice the barrel ceiling. This is where we will sit down, change our shoes & hang up our coats. The second one is in the great room.

Pocket Door

Tuesday, November 16, 2010

Eyebrows and Corbels


The two smaller south facing windows now have "eyebrows" and corbels.

Columns


Columns on the back porch were finished today.

Shelf


This shelf is above the closet in my office/craft room.

Nails


Here you see Dan removing nails from boards that were used to reinforce the framing while the trusses were installed.

Monday, November 15, 2010

Corbels and Columns



We had sunshine and corn snow today.

Friday, November 12, 2010

Framing and Cleaning


Front Gables Completed



The crew started early (7:30) and completed the front gables. They stopped at 3:00 and will return on Monday to complete the framing on the inside.

coffee stain


Oops! The crew has been very careful about not spilling things on the floor, since we plan to stain the concrete. However, Bryon's coffee tipped over in the kitchen. Luckily it landed right next to the north wall where the cabinets will be located.

Thursday, November 11, 2010

Front Gable