Monday, September 20, 2010

Heismanns




Jeff, Stephanie, and Drew came to see us Sunday afternoon. Jeff, our nephew, is Dick's son. The last time we saw them was about 6 years ago in MO at a Thanksgiving family reunion.

Sunday, September 19, 2010

Art in the Alley


Once a month, during the summer, Henderson Art Commission, sponsors Art in the Alley in downtown Henderson from 6:30 to 8:30. This picture shows Sandy surrounded by her beautiful stained glass art.

Mower Madness Mess


These are Dick's retirement projects.

Saturday, September 18, 2010

Dick & Sandy Heismann




We're visiting Dan's brother, Dick, and his wife Sandy. They live in Henderson, TN and are also building a house. Look at all of those angles in their attic!

Fun at the Park



Last week Noah and I took a walk to the neighborhood park in Golden.

Monday, September 06, 2010

Lesson





Jennie worked with three students today on horsemanship skills. What a great teacher!

Picnic




We gathered at Zac & Jennie's for a family picnic. Zac was the cook and Jennie was in charge of bubbles for Noah.

sunflowers


We are enjoying these beautiful sunflowers while camping at the "Heismann Ranch," here in Golden.

Thursday, September 02, 2010

Slab on Grade





Today they poured the floors of our house. They arrived about 7 am and the last of the four cement trucks left about 11am. The Canon Cement crew is working hard to get everything done today. Tomorrow they will cut in the grooves to help minimize cracking of the slab.

Monday, August 30, 2010

Cutting


Dan has been cutting the foam at a 45 degree angle along the foundation walls.

Leaks


The water system wasn't holding air - for the second time. Although it passed inspection, it developed two leaks. Hopefully this will be the last leak and we can get the slab poured later this week.

Thursday, August 26, 2010

Radiant Floor Tubing



Two men from Ted's Plumbing & Hydronics are installing the tubing. Dan is finishing up the "fines" in the garage area.

Our own dump station

Tuesday, August 24, 2010

Pushing the gravel


Gus and Nancy came for a few days on their way home from Creede, CO where they were attending an RV rally. We sure enjoyed their visit and help today!

Double rainbow


This view of the double rainbow is to the east. The garage area has about several inches of "fines" or gravel, in preparation for the radiant floor tubing.

Cutting the Foam


We were lucky to have our friend, Curt Sorenson, help us install insulation under the slab. After Curt and Karen finished taping the insulation, Curt cut the foam for the stem walls. Dan was busy putting glue on the foam for the stem walls.

Friday, August 20, 2010

Garage floor is "foamed"


We have put down the black plastic and the foam on the garage floor. We still need to put foam on the sides of the stem wall in the garage area.

Thursday, August 19, 2010

Foam



The 1 1/2 " slab insulation foam was delivered this morning. Dan and I plan to install it ourselves.

Sunday, August 15, 2010

August 15, 2010


We have hired a consulting firm, U Build It, to help us build our house.

Saturday, August 14, 2010

Sandbox


Tools needed for leveling the "sandbox" included:
the bobcat, the rakes, the shovels, the string, & the measuring stick.
Dan, using his bobcat, moved buckets of dirt into the needed areas, Karen and Mary used the shovel & rake to smooth the dirt and then the string and measuring stick to ensure the correct level. This view is to the North and we are working in "Dan's room."

Wednesday, August 11, 2010

August 10, 2010



Ted's Plumbing and Hydronics and Tony Carestia Excavating worked today on the rough-in plumbing and the septic systems. Ted has had to wait for some parts to arrive before calling for an inspection. Hopefully he'll finish up tomorrow.

Tony has worked hard on installing our septic system. He'll bring some more gravel up tomorrow to finish up the leach field and wait for the inspector.

Tuesday, August 10, 2010

8-9-10



Mary (Dan's sister) is here and she is helping us get organized!

Friday, August 06, 2010

August 6, 2010


The rain came.

Thursday, August 05, 2010

Compacting


After back filling the ditch, Tony, the excavator, is compacting the soil.

Back filling


This view is to the East.

August 4, 2010



Digging the ditch from the house to the cistern and connecting the hose to the cistern.

Monday, August 02, 2010

Finished Foundation



The guys came back today and removed the forms from the stem wall. It looks really good, no voids, etc. Next up is backfilling once I get the water line stubbed in.

Friday, July 30, 2010

Stem Wall Poured


The stem wall was poured this morning. The crew will be back Monday to remove the forms.

Thursday, July 29, 2010

Ready for More Cement


The forms for the foundation's stem walls were installed today. The county inspector passed them and the concrete will be poured in the morning. YIPPEE! Another milestone.

Tuesday, July 27, 2010

July 27, 2010



Today was the pouring of the cement for the footers.

Monday, July 26, 2010

July 26, 2010


The foundation contractors are finishing installing the forms for the footers this morning. We'll have an inspection today also. The green pipe next to the contractor is a 6" PVC pipe to allow for installation of a geothermal system in the future.

Thursday, July 22, 2010

July 22, 2010


The excavator has completed the trenching for the foundation. This view is to the south.