Wednesday, December 29, 2010
Blue Walls
We started to insulate the walls using the blue foam that was left over from the insulation that we put on the foundation. This wall is between the second bathroom and the laundry room.
Posted by
Dan & Karen
at
7:42 PM
0
comments
Monday, December 27, 2010
Got Rocks?
Dan, with the help of the bobcat, moved some of the bigger rocks alongside the driveway in order to stop traffic driving in that area and hopefully the native grass will return.
Posted by
Dan & Karen
at
5:03 PM
0
comments
Saturday, December 25, 2010
Friday, December 24, 2010
Merry Christmas
We are off to Golden to celebrate Christmas with Zac and Jennie and Jeremy and Stephanie and Noah.
Posted by
Dan & Karen
at
7:58 AM
0
comments
Wires
Dan has been helping the electrician with the wiring of the house. The inspector came by yesterday and passed the electrical rough-in. Yeah!
Posted by
Dan & Karen
at
7:43 AM
0
comments
Roof
These pink balls are "tracks" from the roofers. This crew was good about cleaning up when they finished.
Posted by
Dan & Karen
at
7:22 AM
0
comments
A&A Satellite
Luke and his helper, Nicole, from A & A Satellite came to install wiring for TV, Internet, telephone, and for other low voltage applications.
Posted by
Dan & Karen
at
7:06 AM
0
comments
Blue Tag
The plumbing inspector came and gave us "The Blue Tag" which means that we can now get propane. The tank will be delivered next week, hopefully.
Posted by
Dan & Karen
at
6:58 AM
0
comments
Tuesday, December 21, 2010
Soffit and Fascia
Four guys came today to install the soffit and fascia. They will be back tomorrow to finish their work.
Posted by
Dan & Karen
at
9:04 PM
0
comments
Trucks
Trucks, trucks, trucks everywhere. There were 2 more in the back of the house. It was a beautiful day for working at Dilley. There were eleven people here at different times during the day.
Posted by
Dan & Karen
at
8:25 PM
0
comments
Saturday, December 18, 2010
Covering the Cement
We bought 4 X 8 sheets of hardboard to protect the cement floor, which will be stained after the drywall is put up. This is in the great room. After we fit them into place and taped them, some of them buckled, so we hope the extra weight will help them to straighten out.
Posted by
Dan & Karen
at
8:13 PM
0
comments
Thursday, December 16, 2010
Boiler
This 95% efficiency boiler will provide all the hot water for the house, both for heating and domestic use.
Posted by
Dan & Karen
at
9:35 PM
0
comments
Temporary workbench
The temporary workbench that Dan built today using his new toy, a nail gun, is located in the mudroom.
Posted by
Dan & Karen
at
9:05 PM
0
comments
Sunday, December 12, 2010
The Last Window

We finally got the remaining window installed last week. I took this picture tonight to show the beautiful sunset I saw. I spent the day installing door handles on the exterior doors and foaming many of the cracks and crevices that I found. More foaming to go. Tomorrow we will be pulling the electrical wire from the meter to the house.
Posted by
Dan & Karen
at
5:26 PM
1 comments
White Christmas
What a wonderful way to start the Christmas season. We went to see Irving Berlin's "White Christmas" at the LaComedia Dinner Theatre.
Posted by
Dan & Karen
at
12:01 PM
0
comments
Wall Hanging
This beautiful quilted wall hanging, one of three designs, was made by Mom Heismann. She made Christmas wall hanging for each her children and grandchildren.
Posted by
Dan & Karen
at
9:47 AM
0
comments
Christmas in Ohio
Mary, my sister-in-law, and I helped Mom Heismann decorate her apartment for Christmas. The barn was the first building in her collection.
Posted by
Dan & Karen
at
9:29 AM
0
comments
Tuesday, December 07, 2010
Windows
Our framers showed up today to put in the last three windows. They were able to install the windows in the two extra bedrooms but the windows for the Great Room were missing the mullion to tie them together. The total size of the Great Room window is about 7' by 9' so it had to be made in two sections. We stapled plastic over the opening to keep the wind and dust out of the house.

Posted by
Dan & Karen
at
9:27 AM
0
comments
Plumbing on Monday

Mick the plumber showed up today and got a number of things done.
First, he installed the black pipe in the utility room for the propane. We will be using propane to heat the house, for hot water and for the kitchen stove.
Next, he installed the dual control valve for the master bath's shower's two shower heads. One head will be fixed and the other on a wand.
Then, he installed pressure meters to test the drainage system for the plumbing rough-in inspection. The system has to maintain a certain amount of pressure for a specified amount of time in order to pass.
Posted by
Dan & Karen
at
8:54 AM
0
comments
Sunday, December 05, 2010
Shingles on the Roof
The delivery of the roofing shingles took place last Friday. They staged the stacks on the peak of the roof to make it easier for the roofers to do their jobs. Hopefully the roofers will be here tomorrow to nail down the shingles.
Posted by
Dan & Karen
at
7:47 PM
0
comments
Thursday, December 02, 2010
Electricity and Bath
The final section of the ditch for running the electricity all the way to the house was dug. There were LOTS of rocks in this section.
The plumber installed the two piece bathtub and shower in the second bathroom. He even let me help without charging me more $$$!
Posted by
Dan & Karen
at
6:50 AM
0
comments