Sunday, December 12, 2010

The Last Window


We finally got the remaining window installed last week. I took this picture tonight to show the beautiful sunset I saw. I spent the day installing door handles on the exterior doors and foaming many of the cracks and crevices that I found. More foaming to go. Tomorrow we will be pulling the electrical wire from the meter to the house.

White Christmas


What a wonderful way to start the Christmas season. We went to see Irving Berlin's "White Christmas" at the LaComedia Dinner Theatre.

puzzle


This 1,000 piece puzzle kept us entertained. Can you spot the missing piece?

Wall Hanging


This beautiful quilted wall hanging, one of three designs, was made by Mom Heismann. She made Christmas wall hanging for each her children and grandchildren.

Christmas in Ohio




Mary, my sister-in-law, and I helped Mom Heismann decorate her apartment for Christmas. The barn was the first building in her collection.

Tuesday, December 07, 2010

Windows

Our framers showed up today to put in the last three windows. They were able to install the windows in the two extra bedrooms but the windows for the Great Room were missing the mullion to tie them together. The total size of the Great Room window is about 7' by 9' so it had to be made in two sections. We stapled plastic over the opening to keep the wind and dust out of the house.


Plumbing on Monday



Mick the plumber showed up today and got a number of things done.



First, he installed the black pipe in the utility room for the propane. We will be using propane to heat the house, for hot water and for the kitchen stove.


Next, he installed the dual control valve for the master bath's shower's two shower heads. One head will be fixed and the other on a wand.




















Then, he installed pressure meters to test the drainage system for the plumbing rough-in inspection. The system has to maintain a certain amount of pressure for a specified amount of time in order to pass.


Sunday, December 05, 2010

Shingles on the Roof


The delivery of the roofing shingles took place last Friday. They staged the stacks on the peak of the roof to make it easier for the roofers to do their jobs. Hopefully the roofers will be here tomorrow to nail down the shingles.

Thursday, December 02, 2010

Electricity and Bath

The final section of the ditch for running the electricity all the way to the house was dug. There were LOTS of rocks in this section.



















The plumber installed the two piece bathtub and shower in the second bathroom. He even let me help without charging me more $$$!

Tuesday, November 30, 2010

Roofing


Today the roofers came and put on the underlayment for the roofing - the ice shield and tar paper. The shingles have to be ordered due to the short supply in the area. Hopefully next week we will have a complete roof.....

Tuesday, November 23, 2010

Bathtub Drain



Mick, the plumber, is preparing the second bathroom for the bathtub drain.

Front Door


Here's the front door, waiting to be stained.

Garage Door



Welcome to the garage.

Sliding door


Windows



The Pella truck with our windows arrived today, however, the three south windows were not on the truck. The kit to put together these extra large windows was not ordered...and is still back at the factory in Kentucky...It is what it is.

East Roof Panels




Putting in the east roof panels was a challenge.

Roof




We finally have a complete roof. The guys put in the missing pieces today.

Monday, November 22, 2010

Master Bathroom Vent



More Pipes


This is where the washer & dryer will go.

Plumbing




These pipes lead to the vent for the second bathroom.