Stem Wall
Here it is, the stem wall for the foundation for the shop. We now have to fill in the ditch around it, which means adding water to wet down the dirt and then tamping down the dirt every 6 inches, adding more dirt and water and tamping until to reaches the chalk line near the top of the 4 foot cement wall.
No comments:
Post a Comment