This blog describes the travels of Dan & Karen Heismann in hopes that their parents, siblings, children and friends will know that they are having a great time and are doing well. Love Ya All.
Dan dug this 120 foot long ditch from the electrical panel to the area where the house will be built. It is about 2 & 1/2 feet deep. That bobcat made short work of this project. The pipe in the ditch is for the electrical wires which will be connected to the panel to provide juice for the house.
Posted by Dan & Karen at 4:25 PM
No comments:
Post a Comment