Sunday, October 19, 2008

Table Full of Tools


This make shift table held tools that were used during the building process.

6 Purlins Up

Saturday, October 18, 2008

I See You!



I see you. The 80 pound purlin is resting on the scaffold and attached to the rope which is tied to the scaffold. Using a rope to haul it up to the top of the rafters helped.

Adding the Braces



The braces were bolted to the purlin and rafter.

Higher



Two pallets were used on top of the scaffold so that Dan could reach those HIGH places.

Above Head



Attaching the nut to the bolt above head is DIFFICULT. The black tool that looks like a microphone (next to Dan's right arm) helped in the aligning of the holes in the purlins so that the bolts would fit. It is pointy on one end. It is called a drift pin or punch.

Ropes



Holding the ropes while Dan lifted the purlins, helped raise them up above the rafters.

Checking the Level



One of my jobs was to use the magnetic level to check the columns. Finding the "bubble" in between the two lines on the level was a good sign.

Bolts



Dan, who is afraid of heights, faced this fear each time he climbed up on the scaffold.

Purlins Up



The 12 Purlins are finally up!

Tuesday, September 23, 2008

Second Wind



September 21, 2008 was the date of the 7th Annual Second Wind Walk/Run/Bike event to raise money for teen suicide prevention. There were over 3,000 participants and 350 volunteers. Thanks to those of you who supported me.

Crib


The crib is now at the painting stage.

Pipe


The pipe fit through the hole and is attached to the cistern and the well.

In the Hole


Cistern





This is Rick, the owner of Rick's Pump Service. He delivered the 1,200 gallon cistern on the 17th. "It goes into this hole."

Watering


Watering the ditch

Stem Wall




Here it is, the stem wall for the foundation for the shop. We now have to fill in the ditch around it, which means adding water to wet down the dirt and then tamping down the dirt every 6 inches, adding more dirt and water and tamping until to reaches the chalk line near the top of the 4 foot cement wall.

Level




The 2 x 4 came in handy when Dan leveled this 6 foot by 6 foot by 9 foot hole for the cistern.

Hole




Dan is creating a hole for the pipe that will go from the cistern to the pump.

Ditch




It took Dan one morning to dig this 5 foot ditch from the well to where the cistern will be installed. Notice the green hose that is attached to the pump. When we turn on the pump, the water that comes out is used for wetting down the dirt around the stem wall.